TECHNIA Manufacturing

From bill of materials to finished goods.

Production orders, routings and shop-floor progress — costed against the same inventory and ledger the rest of your business already runs on.

James Whitfield
Sales Manager
Sales
SO-2026-1188
Isabelle Hart
Production Planner
Manufacturing
Isabelle Hart·Production PlannerManufacturing

The order needs 28 beds we don't hold. The production order explodes the bill of materials and books the work centre.

TECHNIA Solutions
New Cairo, Egypt · Sharjah, UAE
info@techniasolutions.co
VAT 512-887-004
PRODUCTION ORDER
# PRD-2026-0288
16 Mar 2026
Released
For
SO-2026-1188 · Lakeside Medical
BOM-0044 rev C · assembly line 2 · planner Isabelle Hart
ComponentPer unitRequiredOn handShortfall
Steel frame, welded12840
Actuator motor, 24V3846024
Control handset12831
Work centre Assembly line 2 · 5 days, 2 shifts
Shortfall 24 actuators · PR raised to Purchasing
Due 21 Mar 2026 · order needs 22 Mar
Units to build28
Material cost$88,340
Standard cost / unit$3,155
Production orderReleased
01What it is

What is TECHNIA Manufacturing?

TECHNIA Manufacturing turns demand into product. It holds the bill of materials and routing for everything you make, raises production orders against real stock, tracks each operation as it moves through the shop floor, and books finished goods and their true cost straight into Inventory and Accounting — no second system, no re-keying.

02Who it's for

From bill of materials to finished goods.

Discrete manufacturersAssembly & fit-out workshopsFood & beverage productionContract manufacturersMake-to-order businessesProduction & plant managers
03Modules included

One product, every module you need.

01

Bills of Materials & Routings

Versioned, per finished item
  • Multi-level bills of materials
  • Versions with effective dates
  • Routings with operation sequences
  • Standard times and setup per operation
02

Production Orders

Raised from demand or by hand
  • Orders raised from sales demand or forecast
  • Material availability checked before release
  • Planned versus actual quantities
  • PDF generation of production orders
03

Shop Floor & Work Centres

  • Work-centre capacity and load
  • Operation start, pause and completion
  • Scrap, rework and yield recording
  • Operator assignment per operation
04

Materials & Inventory

Integrated with Inventory & Purchasing
  • Component reservation against the order
  • Issue to production and back-flush
  • Shortages raised as purchase requests
  • Finished goods received into stock
05

Costing & Analytics

  • Material, labour and overhead per order
  • Work-in-progress valuation
  • Actual versus standard cost variance
  • Throughput, yield and scrap reporting
04In one system

Every order starts as one bill of materials.